Wednesday, April 11, 2012

Headliner Installation in Progress

 So the headliner project is underway and we were able to get quite a bit done over the last few nights. Skylark had no headliner, apparently pulled off over the years leaving only the fiberglass "roof." We started by running half by 1 inch strips, 20 inches apart forward to aft. Once the strips were installed, we dry fit half inch insulation sheets cut to size in between and prepared for the planks.
I will post a step by step recount of the project, but wanted to throw up some pics now that the majority is done in the main cabin. So far, so good.

1 comment:

  1. The headliner looks really great. I need to do replace the headliner on my boat as it looking very tired, and hadn't thought of using timber planks.
    Look forward to seeing the step by step breakdown.
    The insulation is a good idea, what did you use?

    ReplyDelete