Monday, January 28, 2013
Friday, February 1
I will be heading down to Skylark on Friday for about a week. Looking forward to some time on the water, warm weather and spending time with Zachary. It's been so cold up in NC for a few weeks now, have really had enough. Going to try to get out at least overnight, but of course need to be back for the Superbowl. Even though New England is out, you still gotta watch. :)
Tuesday, December 25, 2012
Lots of People Looking but...
Just looked at the stats for the first time in a while and noticed a lot of folks looking through the posts. Feel free to say hi or ask questions. You would be surprised how much useless information I have to give. :)
Enjoy.
Enjoy.
Merry Christmas 2012
Wow, that was a quick year. Just wanted to wish everyone a Merry Christmas and a wonderful New Year. I hope it brings everything you wish for.
Monday, November 19, 2012
Four Months Since My Last Post...Really??!!
Sorry folks, life has had a nasty way of taking over and keeping me up in NC longer than expected. Was also in Houston Texas for a week on business. Lots of running around but I was able to spend 5 days last week on Skylark. Had a fantastic weather window and enjoyed day after day of mid 70 degree days, a light breeze and perfectly clear skies.
Skylark was waiting patiently to see me and all was well with the new systems. Was too busy to get out but was able to run the engine in gear for about 45 minutes and was very happy with what the gauges were telling me. I had a problem with oil pressure and engine temp at first, but Ralph seems to have taken care of everything at this point (what else is new:). She started right up and ran very smoothly. I do think the engine is ready to go. Now if I can just find a few days to make that happen.
Nothing else really to report at this time. Just preparing for the holidays and working. I did get a new toy for when I am in NC, perfect for the mountains and the Blueridge Highway. It's a Heist from CCW, a small company in Cleveland. If you are looking for something small to run around your home town, I highly recommend it. Check it out... Cleveland Cycle Werks.
Next on my list for winter sailing. A propane heater for the cabin...
Skylark was waiting patiently to see me and all was well with the new systems. Was too busy to get out but was able to run the engine in gear for about 45 minutes and was very happy with what the gauges were telling me. I had a problem with oil pressure and engine temp at first, but Ralph seems to have taken care of everything at this point (what else is new:). She started right up and ran very smoothly. I do think the engine is ready to go. Now if I can just find a few days to make that happen.
Next on my list for winter sailing. A propane heater for the cabin...
Wednesday, July 18, 2012
Solar Panel, Nav Station and LPG Install
I know I said I was getting away from the refit stuff going forward, but I have had quite a few people ask about the nav panel, solar and LPG tank install, so I figured I would end out the refit chapter with a bang. Everything we set out to do is complete and I am ecstatic. Thank you Ralph for all the incredible work you have done, which of course was pretty much everything!
Solar Panel
After doing a lot of searching online, I decided to go with a 100 watt panel from sunwindproducts. I was very happy with the customer service, prices and options. If you are in the market for solar or wind products, check them out. It's early in the game, but the panel seems to be doing exactly what it says it would and is putting the amps into the batteries as expected.
We decided to mount the panel to the stern rail with hinges that will allow it to be swung down in bad weather. Used a deck fitting for the wires, but other than that, it was straight forward.
The charge controller is a basic 7 amp unit from Sunforce. Since I only have the one panel generating less than 7 amps, I didn't see a need to spend hundreds of dollars on a bigger unit. It fits nicely behind the nav station making it easier to hook into the system. Both the solar panel and wind generator can be set by the main battery switch to charge what ever battery bank I want. Of course the house bank gets most of the juice, but in an unforeseeable happenstance that both banks are drained, I can send all the power to the starting battery and get the engine running.
Nav Station
The final components to the Nav Station have been added. All the wiring has been replaced with proper gauge, tinned marine wire and connections. A new 4 stage Protech 1220i battery charger was installed behind the panel as well as the 7 amp solar panel charge controller. Included in the panel is the LPG solenoid switch, VHF, stereo/CD player, amp meter for the wind generator and wind generator control switch, Raymarine chartplotter, 120 AC breaker panel and the DC 12 breaker panel* with built in volt meter.
These were all placed in a custom built panel that was mounted on the starboard side shelves above the quarter birth. It's a great feeling to know that when I flip a switch, it's going to work. It was a big job sifting through the rats nest that was there, but Ralph knocked this one out of the park.
* As you might have noticed, I am still waiting for the new breaker panel labels to arrive. I promise there are no trim tabs on Skylark.
LPG Solenoid, Switch and Tank Locker
Skylark did not come with a propane tank locker, so we had to build one. Actually, we were able to get a "tub" that would fit a 20 pound tank that was left long ago and sitting in the marina. From there, Ralph cut a hole in the aft "seat" behind the tiller and mounted the tank from underneath. There was plenty of room below that area in the locker, so it was the perfect place for it. A spill hole, tube and through-hull were installed to get the propane gas overboard in case of a leak, the purpose really for the locker in the first place. A square water proof hatch was then installed over the tank making it very easy to replace when necessary.
In addition, a solenoid control switch was installed in the galley which operates the solenoid valve attached to the tank. This is a safety feature that allows you to easily turn the propane off from the galley as well as monitors pressure from the tank.
So that's it, time to start enjoying the fruits of out labor.
Solar Panel
After doing a lot of searching online, I decided to go with a 100 watt panel from sunwindproducts. I was very happy with the customer service, prices and options. If you are in the market for solar or wind products, check them out. It's early in the game, but the panel seems to be doing exactly what it says it would and is putting the amps into the batteries as expected.We decided to mount the panel to the stern rail with hinges that will allow it to be swung down in bad weather. Used a deck fitting for the wires, but other than that, it was straight forward.
The charge controller is a basic 7 amp unit from Sunforce. Since I only have the one panel generating less than 7 amps, I didn't see a need to spend hundreds of dollars on a bigger unit. It fits nicely behind the nav station making it easier to hook into the system. Both the solar panel and wind generator can be set by the main battery switch to charge what ever battery bank I want. Of course the house bank gets most of the juice, but in an unforeseeable happenstance that both banks are drained, I can send all the power to the starting battery and get the engine running.Nav Station
These were all placed in a custom built panel that was mounted on the starboard side shelves above the quarter birth. It's a great feeling to know that when I flip a switch, it's going to work. It was a big job sifting through the rats nest that was there, but Ralph knocked this one out of the park.
* As you might have noticed, I am still waiting for the new breaker panel labels to arrive. I promise there are no trim tabs on Skylark.
LPG Solenoid, Switch and Tank Locker
In addition, a solenoid control switch was installed in the galley which operates the solenoid valve attached to the tank. This is a safety feature that allows you to easily turn the propane off from the galley as well as monitors pressure from the tank.So that's it, time to start enjoying the fruits of out labor.
Bayou Morning in NC
Enjoy!
Labels:
beignet,
cafe du monde,
new orleans
Tuesday, June 12, 2012
Chapter 3
Since we have finished Chapter 1, The Refit and Chapter 2, The Short Journey Home, it is now time for Chapter 3, Skylark is Finally Out There. So unless there is something specific that you would like to see or hear about in more detail from a project perspective, I will start gearing my posts to what this Blog was always meant to be, Sailing Adventures on a Cal 34. Let the games and nightmares begin!
I think Chapter 3 will start off with a nice shakedown cruise north to Cumberland Island, GA. It's a wonderful place to anchor out and enjoy for a week or so making sure all of the systems are working as expected. Zachary and I will make the trip at the beginning of July, weather permitting. There is a good chance one of my friends and his sons will be buddy boating with us from the marina. I am very much looking forward to getting away from the dock and getting back out to sea.
It's time.
Saturday, June 2, 2012
So Let's Review...
Over the last 4 months, we have gotten more done on Skylark than over the last 3 years. It's been hectic yet extremely rewarding to see the transformation happen. I couldn't be happier with how things came out. Ralph is certainly a master of his trade and did everything exactly as it should be done, period. Again, I couldn't be happier.
Tomorrow, I will be heading back to NC for a little while, then up to visit with the family in New York. Yesterday was Zachary's last day of school, so he too is looking forward to some time up north. In late June, we will be back in FL ready to take a trip up to Cumberland, GA on Skylark for a week or so. Needless to say, I will be looking forward to that.
I have posted quite a few of the projects as we went a long, but I thought a list of the completed jobs would be fun to see. If anyone has questions on anything I did, please let me know, I will be happy to send pics or pass along any tips.
What did we do?
Have a good June, I hope to see you out on the water soon.
Tomorrow, I will be heading back to NC for a little while, then up to visit with the family in New York. Yesterday was Zachary's last day of school, so he too is looking forward to some time up north. In late June, we will be back in FL ready to take a trip up to Cumberland, GA on Skylark for a week or so. Needless to say, I will be looking forward to that.
I have posted quite a few of the projects as we went a long, but I thought a list of the completed jobs would be fun to see. If anyone has questions on anything I did, please let me know, I will be happy to send pics or pass along any tips.
What did we do?
- Water tank - Built access hatches to the water tank under the V-birth. Removed tank and cleaned. Installed all new fresh water hoses to the faucets in the galley and head. Replaced both faucets.
- Cold Plates - Converted the icebox to refrigerator with Norcold cold plates. (There is a post on this)
- Sea Hood - Customized an existing sea hood found at Sailors Exchange to fit over the sliding hatch over the companion way. (There is a post on this)
- Deck Paint - Painted the decks white on white. (There is a post on this)
- New Navigation Station - Have not posted the full project yet, but will soon. We custom built a navigation station above the starboard shelf over the aft quarter-birth. Ran all new 12v and 110 wire through out the boat including all wires in the engine harness. Built new panel to cover where the old electric switches were.
- New House Battery Bank - Replaced existing 2 group 27 batteries with 4 6volt golf cart batteries totaling 430 amp hours. Moved the starting battery into the engine compartment and is charged as a separate bank.
- Bow Roller Install - Moved the deck mounted navigation lights and installed a heavy duty bow roller and cleat. Added a 22 pound Bruce anchor to the roller and kept the Danforth on the deck.
- Headliner - Insulated with quarter inch sheets and then stained and polyethylened wood. (There is a post on this)
- Propane Locker - Glassed in a 20 pound tank "tub" under the aft seat, installed an access hatch and ran a spill hose out a through-hull below the aft transom. Installed a solanoid control switch in the galley and a solanoid on the propane tank.
- Wind Generator - Installed 400w AirX wind generator that is controlled through the main panel and can charge either or both banks at the turn of a switch.
- Bilge Pump Configuration - Removed the original 500 gallon per hour pump and replaced with a 1500 gallon per hour pump and automatic float switch. Removed the old hose that emptied the bilge water into the cockpit and ran a hose to the aft where a through-hull was installed below the transom. Cleaned the bilge of all dirt, oil and debris.
- Bow Navigation Lights - Removed bow rail and welded a flat piece of stainless so lights could be mounted. Ran the wires through the bow rail tubes and then below decks.
- Engine - Finished install of new engine. Took carburetor off for a complete cleaning, replaced all electrical components. Ran all new wires to and from batteries, switches and gauges. Installed new muffler and built new water exhaust elbow. Ran all new tubing for blower.
- Solar Panel - Install a 100w solar panel and charge controller.
- Tiller - Reinforce tiller in the new bracket. Install tiller pilot.
Have a good June, I hope to see you out on the water soon.
Friday, June 1, 2012
Very Cool Blog, Very Cool People
If you haven't had a chance yet to take a look at the adventures of Windtraveler, now is the time. I have been following for a while and look forward to the next chapter of their journey including a new boat and a new crew member.
Check them out
Saturday, May 26, 2012
Tropical Storm in May, Really??!!!
Yup, here we go again. Tropical storm Beryl is heading directly for northern Florida, more specifically Jacksonville. Looking at 40 to 50 mph winds and a ton of rain all week. Oh well, so much for a weekend on the water.
Labels:
Tropical Storm Beryl
Sunday, May 6, 2012
New Orleans Jazz Fest
![]() |
| NO Jazz Fest 2012 |
| Pascgoula Run |
| Beignets at Cafe du Monde |
Thursday morning was hot, real hot and humid, so we know the day to follow was going to be interesting. The festival grounds had 2 main stages and about 5 smaller ones where local and big named bands came from all over to play. I was there to see Jimmy Buffett on Thursday and the Zac Brown band on Friday but really enjoyed all the local sounds that was going on.
| Good seats |
| Zac doing his thing |
| Amy baking in the sun |
| Bridge over the Mississippi |
I had such a great time in New Orleans. I would highly recommend it to anyone who hasn't been. There was so much we didn't get to do, but I was able to stand up on the banks of the Mississippi River and watch some tugs push their barges down river. That was very cool indeed. I hope to get back there someday soon.
Subscribe to:
Posts (Atom)







